(PS-4230) Schedule Narratives and Reports Presentation: 0.1 CEU Delbert E. Bearden, PSP, 59 min 45 sec
(PS-4233) How Recommended Practices for Project Scheduling are Becoming Obligations by Project Contracts Presentation: 0.1 CEU Saeid Khademagha, PEng PSP, Ali Yazdani, PEng, 46 min 43 sec
(PS-4236) Correcting Out-of-Sequence Logic Presentation: 0.1 CEU Ronald M. Winter, PSP FAACE, 59 min 55 sec
(PS-4241) The Top Ten Approaches to Avoiding Resource-Related Claims Presentation: 0.1 CEU Glen R. Palmer, CFCC PSP FAACE, Christopher W. Carson, CEP DRMP PSP FAACE, 71 min 40 sec
(PS-4267) Planning and Scheduling for Workplace Safety Presentation: 0.1 CEU Mark David Smith, Daniel P. Gilmour, PSP, Matthew Smith, 58 min 43 sec
(PS-4315) Schedule Development and Progress Measurement Requirements for Fixed-Price Construction Contracts Presentation: 0.1 CEU Ricardo Albeny, CCP EVP, 39 min 47 sec
(PS-4342) A Statistical Approach to Developing Empirical System Durations for Wastewater Treatment Plants Presentation: 0.1 CEU Shreyas Raghavendra, Christopher W. Carson, CEP DRMP PSP FAACE, 61 min 37 sec
(PS-4354) An Efficient Approach to Scheduling Repetitive Projects Presentation: 0.1 CEU Christopher W. Carson, CEP DRMP PSP FAACE, 55 min 8 sec
(PS-4358) An Overview of Hydropower Projects in Canada Part 2 (Spillway) Presentation: 0.1 CEU Ali Montaser, PEng CCP EVP PSP, Ahmed Montaser, EVP, 60 min 57 sec
(PS-4360) (Panel Discussion) 100 Years of Federal Project Scheduling Insights and Lessons Learned Presentation: 0.1 CEU Diane Bragoni, PSP, Michael R. Nosbisch, CCP PSP FAACE, Patricia Bolton, PE, Karen Mislick, Mo Aboushousha, 59 min 24 sec
(PS-4377) Addressing Schedule Complexity and Optimizing Scheduling process for Infrastructure Projects Presentation: 0.1 CEU David A. Chigne, CCP CEP PSP, Shrutika Barwal, PSP, 47 min 33 sec
(PS-4387) Mastering Risk Factors for Renewable Energy Projects So You Don't Get Burnt, Blown Away, or Washed Out Presentation: 0.1 CEU Matthew D. Baker, Christopher J. Brasco, Dakus Gunn, 65 min 14 sec
(PS-4415) (Presentation Only) Schedule Analysis Best Practices for Capital Projects Presentation: 0.1 CEU Dave Ingalls, EVP, 56 min 55 sec
(RISK-4240) Case Study: Use of the Hybrid Parametric and Expected Value QRA Method on the Keeyask Hydropower Megaproject Presentation: 0.1 CEU John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life, Raminder S. Bali, PEng, 57 min 31 sec
(RISK-4247) Defining a Lognormal Distribution Using 3-Point Entry: the J-QPD Distribution Presentation: 0.1 CEU John K. Hollmann, PE CCP CEP DRMP FAACE Hon. Life, J. Eric Bickel, 59 min 10 sec
(RISK-4307) Treading Cautiously: Risk Management in the Leapfrogging of Offshore Wind Turbine Technologies Presentation: 0.1 CEU John Coker, Emily J. Byrd, 34 min 21 sec
(RISK-4330) Navigating Risk Management Challenges in Progressive Environments: Case of Progressive Design Build Contract Delivery Models Presentation: 0.1 CEU Roozbeh Panahi, Katia Rizkallah, Kyle Mawhinney, Sara Martino, 60 min 32 sec
(RISK-4345) (Presentation Only) Review of Risk/Reward Sharing Mechanisms in Collaborative-Based Projects Presentation: 0.1 CEU Dr. Moe Roghabadi, Camelia Bucur, Dr. Farzaneh Golkhoo, Sohiel M. Hassan, 55 min 32 sec
(RISK-4356) Enhancing Decision-Making Process through Probabilistic Schedule Analysis Across the Project Lifecycle Presentation: 0.1 CEU Abbas Shakourifar, PSP, Dr. David T. Hulett, FAACE, Keith D. Hornbacher, Steve Uhl, 45 min 47 sec
(RISK-4367) Challenges Aggregating Multiple, Interdependent Projects into an Integrated Program-Schedule Quantitative Risk Analysis Presentation: 0.1 CEU Dr. David T. Hulett, FAACE, Ian Bailey, Lorrie B. Tietze, 64 min 15 sec
(RISK-4401) Assessing Proposed Risk Mitigation Actions Using Mitigation Scoring Presentation: 0.1 CEU Waylon T. Whitehead, Dr. David T. Hulett, FAACE, 60 min 44 sec
(RISK-4435) Practical Implementation of AI-Based Risk Analysis on Construction Megaprojects Presentation: 0.1 CEU Rhys Phillips, Dev Amratia, Carlos Ledezma, Richard Bendall-Jones, Vahan Hovhannisyan, Leonie Anna Mueck, 58 min 41 sec
(TCM-4238) (Presentation Only) The Six Elements of Project Controls Presentation: 0.1 CEU H. Lance Stephenson, CCP FAACE, 59 min 26 sec
(TCM-4314) Desalination Public-Private Partnership: Assessment of Plants Operation Costs Presentation: 0.1 CEU Mayar M. Khairy, Mohamed Abdel Raouf, A. Samer Ezeldin, 47 min 10 sec